Amira Hass in Ha’aretz: “On October 3, a team from Comet-ME, which had built the hybrid system, reinstalled the panels and reconnected them to the rest of the system, after they were released unconditionally from the Civil Administration warehouses in Gush Etzion. The circumstances of the matter, i.e., the reason the village even needed this hybrid system to begin with, is that for decades the Civil Administration has been turning down its requests to connect to the electricity grid.